Description
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
- Slightly curved design
- Slip-joint knife
- Satin-finished 8Cr13MoV stainless steel blade
- Opened by nail nick
- Does not lock
- Lightly contoured textured G10 handle scales
- Fits comfortably in hand
- With clip

Magnum
Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.
Specifications
Dimensions
Overall Length
7.24"
Blade Length
3.15"
Blade Thickness
0.11"
Product Weight
2.75oz
Details
Model
01SC080
Blade Material
8Cr13MoV
Handle Material
G10
Opener
Nail Nick
Opening
Manual
Lock Type
Slipjoint
Item Condition
New
Warranty / Certifications
Warranty
Lifetime
Reviews

Boker is shipped free across Canada on orders over $149. Boker Knives of Solingen, Germany has been producing knives and tools for over a century and today they are one of the foremost knife makers in the world.